The reality is $11 billion. The money went straight into heavy maintenance for depreciating assets and excess fuel burn. The actual bottleneck paralyzing the assembly lines is not a shortage of high tech avionics. Or next generation jet engines. A $100 million aircraft assembly line grinds to a halt. The public assumes a shortage of glamorous technology is to blame.

Insight 5 of 9 from the full story.

Unfold the Case